Transport
July 3, 2025
Radars will measure drivers' speed in Petrůvka and Biskupice
The aim of the new measures is not to fine drivers, but to make…
June 19, 2025 From Kateřina Nosková
A new cyclobus has started to travel to the popular Bevlava cycle path. It also stops in Luhačovice
"The introduction of the new line is another step towards making the Bevlava cycle…
February 4, 2025 From Kateřina Nosková
Luhačovice is expanding its parking capacity. Another 56 spaces are available for drivers at the town swimming pool
The town hall of Luhačovice has great news for residents and visitors of the spa town. Drivers can now use another 56 parking spaces in the town centre. These are garage parking spaces in the lower part of the parking lot at the town swimming pool on Solná Street.
July 3, 2025 | commercial article
Radars will measure drivers' speed in Petrůvka and Biskupice
most read articles in 30 days
January 31, 2025 From Kateřina Nosková
A new footbridge for pedestrians and cyclists will soon be built on Družstevní Street
The construction of a new footbridge for pedestrians and cyclists will soon begin on Družstevní Street in Luhačovice, which will improve the town's connectivity. Luhačovice management is now finalizing the process of selecting the contractor.
October 25, 2024 From Kateřina Nosková
Extensive reconstruction of the car park behind the shopping centre has begun. 71 parking spaces will be created
At the beginning of this week, an extensive reconstruction of the parking lot behind the shopping centre was started in Luhačovice, where 71 parking spaces will be created. If everything goes according to plan, the first drivers should start using the new spaces in April 2025.
June 3, 2024 From Kateřina Nosková
Bypass near Luhačovice to help reduce traffic in the town centre and protect healing springs
Reducing traffic congestion in the centre of the spa town and protecting the local natural healing waters. These are the main reasons for the construction of the planned road bypass near Luhačovice, which a few days ago came a little closer to realization.
May 7, 2024 From Kateřina Nosková
The construction of the expected cycle path between Polichno and Újezdec has started. It will be ready in autumn
The first cyclists should ride on the new cycle path connecting the local part of Polichno with Újezdec u Luhačovic at the beginning of November at the latest. Construction work on the long-awaited one-kilometre route began in April and will cost approximately CZK 23.5 million.
February 28, 2024 From Kateřina Nosková
Unruly drivers will be monitored by cameras in the centre of Luhačovice
Drivers who violate traffic regulations in the centre of Luhačovice will have a break from the beginning of March. New cameras have been installed in Masarykova Street at the junction to U Št'ovnice Street to monitor motorists' driving. Drivers often make illegal turns at this location, drive into oncoming traffic in a one-way street and endanger pedestrians at the crosswalk.
June 26, 2023 From Kateřina Nosková
Luhačovice is expanding the network of cycle paths towards Uherský Brod. The new road will connect Polichno with Újezdec
The construction of a new cycle path connecting the local part of Polichno with the cycle path in Újezdec u Luhačovic has been given the green light. Many years of efforts to safely connect Uherský Brod and Luhačovice for cyclists and other trail users will thus progress one more piece.
The server is operated by © ZLIN.CZ s.r.o.